Bathroom Remodeling | Finesse Remodeling Call (818) 881-8333 Mon–Fri 9–5

Bathroom Remodeling Waterproofed properly, tiled precisely, finished on schedule

Primary suites, hall baths, powder rooms, and tub-to-shower conversions. Built from the membrane outward.

Licensed & insured · Free in-home consultation · Fixed written pricing

1989
Building here since
6
Remodeling services
12
Communities served
Free
In-home consultation
The service

Bathrooms built to stay dry

A bathroom is a small room with more ways to go wrong than any other space in a house. Everything in it is wet, everything in it is tight, and almost everything that fails does so invisibly behind tile for several years before anyone notices.

That is why we build bathrooms from the waterproofing outward. The membrane, the slope of the pan, the way the shower niche is detailed, the transition where tile meets the floor: those are the decisions that determine whether the room is still sound in fifteen years. Tile is what you look at. Waterproofing is what you paid for.

The rest follows from layout. Bathrooms in postwar Valley homes were sized for a very different set of expectations, which usually means a single hall bath with a tub-shower, a small vanity, one ceiling fixture, and no ventilation worth the name. There is often more room to work with than it appears, either by borrowing from a closet, squaring off a doorway, or simply abandoning a tub nobody has used since the kids moved out.

One crew handles all of it. Demolition, framing, plumbing, electrical, waterproofing, tile, glass, vanity, fixtures, paint, and the punch list. Nobody is standing around waiting on a trade that never showed.

Ventilation is not optional

Many older bathrooms here were built with a window and nothing else, or with a fan that vents into the attic rather than out through the roof. In a climate where a bathroom door stays closed and a shower runs hot, that is how paint peels, how door casings swell, and how mold starts behind the vanity. Proper exhaust ducted to the exterior goes into every bathroom we build.

Fixed written pricing

You get a fixed written price after we have seen the room, with tile, fixture, and glass allowances broken out line by line. Bathrooms are where allowances matter most, because the gap between a builder-grade faucet and the one you actually want is large and worth knowing about before you commit.

Permits and inspections

Moving plumbing or electrical, altering a wall, or adding an exhaust fan means a permit. In Encino and most Valley neighborhoods that is the Los Angeles Department of Building and Safety; Burbank, Calabasas, and Beverly Hills run their own. We prepare and file the plans and meet the inspector on site.

Call (818) 881-8333
Scope

The bathrooms we build

Every bathroom in a house is a different project with a different budget and a different reason for existing. Treating them all the same is how people overspend on one and underspend on another.

Primary bathrooms

The one worth spending on, because you use it twice a day for as long as you own the house. This is where a curbless shower, a proper bench, a handheld on a slide bar, dual vanities, and separated toilet space earn their cost. In postwar homes the primary bath is often undersized relative to the bedroom next to it, and borrowing a few feet from a closet is frequently the cheapest square footage available.

Hall and kids’ bathrooms

Durability first. A tub is worth keeping here, tile should be something that survives a decade of hard use, and storage matters more than a statement vanity. This is also the bathroom most likely to have the original 1950s plumbing still in the wall.

Guest and powder rooms

The smallest room in the house and the one where a bold material choice costs the least to make. No shower means no waterproofing scope, which is why a powder room is the fastest bathroom we build and the one that changes a first impression most per dollar.

Tub-to-shower conversions

Removing a tub nobody uses and building a proper walk-in shower in its place. The framing is straightforward; the part that matters is the pan, the slope, and the drain relocation. Keep one tub somewhere in the house if you can, both for resale and for anyone with small children.

Worth knowing

Large-format tile and slab shower walls need a substrate that is genuinely flat, not merely straight. In older homes the studs rarely are. Floating the walls to plane before tile is unglamorous work that adds a day or two and is the entire difference between crisp grout lines and lippage you will notice every morning.

How it works

The remodel, step by step

Six phases. The order matters more in a bathroom than almost anywhere else, because waterproofing has to be inspected and cured before a single tile goes on the wall.

Day 1 · 45–90 minutes

In-home consultation

We measure the room, check what is under the vanity, look at the venting, and find out where the drain and supply lines run. Whether the toilet drain can move is often the question that decides the entire layout.

3–5 days

Design, selections, and fixed quote

A measured layout, tile and fixture options at three price points, and a fixed written price with allowances broken out. Selections get locked before demolition, because a tile decision made mid-project stalls everything behind it.

Ordering window

Materials ordered, permits filed

Tile, glass, vanity, and fixtures are ordered up front. Shower glass is measured and fabricated after the tile is set, so that piece is scheduled rather than ordered early. Plans are filed in parallel where a permit applies.

1–2 days

Demolition

Down to the studs and subfloor. This is when we find out what the last sixty years did to the framing around the pan, and we show you before we cover it back up.

1–2 weeks

Rough-in, waterproofing, and tile

Plumbing and electrical rough-in, inspection, then backing, waterproofing membrane, and a flood test on the pan before tile. Tile setting and grout follow. This is the longest phase and the one that should not be rushed.

Final week

Fixtures, glass, and walkthrough

Vanity, toilet, faucets, mirrors, lighting, and hardware go in, then custom glass is installed to the finished dimensions. We walk it with you, write the punch list, and clear it before final payment.

Materials

Tile, surfaces, and fixtures

Tile choice affects labor cost as much as material cost, which is the part most quotes never explain.

SurfaceWhere it worksWatch out forUpkeep
Porcelain tileFloors, shower walls, anywhere wetVery little — the default for good reasonGrout cleaning
Large-format porcelainShower walls, fewer grout linesNeeds a genuinely flat substrate; heavier to setMinimal
Natural stonePrimary baths, statement wallsEtching from acidic cleaners; varies slab to slabSeal periodically
QuartzVanity topsDirect heat from a styling toolNone
Zellige and handmade tileAccent walls, powder roomsIrregular by design — slower to set, higher laborSeal, then minimal

Scroll the table sideways on a phone.

Where the money is worth spending

Valves and drains. Nobody sees them and replacing them later means opening the wall you just tiled. A quality pressure-balanced or thermostatic valve is one of the few upgrades in a bathroom that you will notice every day and never have to think about again.

Lighting is the other one. A single ceiling fixture puts every shadow on your face exactly where you do not want it. Light at the mirror from both sides, or at minimum an even wash across it, is the difference between a bathroom that photographs well and one that works at 6am.

Budget

What drives a bathroom budget

Bathrooms are small rooms with dense scope. Square footage tells you very little about what one costs.

  • Whether fixtures move. Keeping the toilet, shower, and vanity in place is dramatically cheaper than relocating any of them, and moving a toilet drain is the most expensive single change in most bathrooms.
  • Tile size, material, and pattern. A herringbone or a stacked large-format layout takes far more labor than a running bond, before the material cost is even counted.
  • Shower glass. Frameless custom glass is measured and fabricated after tile is set. It is a real line item and it is worth what it costs.
  • Whether the shower gets a niche, bench, or curbless entry. All three are framing and waterproofing decisions made before demolition, not finishes selected later.
  • What the demolition uncovers. Rot around the pan, a rusted flange, or galvanized supply lines are common in houses of this age and are cheaper to fix now than to fix twice.
  • Electrical. Adding a ventilation fan, a heated floor, or code-required outlets often means running new circuits from the panel.
Plan for the unknown

Hold 10 to 15 percent in reserve. Bathrooms in pre-1980 houses hide more than kitchens do, because the failure mode is slow water rather than obvious wear, and nothing about it is visible until the tile comes off.

We price the room after seeing it, in writing, with allowances itemized. A bathroom quoted over the phone is a guess about a room full of things nobody has looked at yet.

Answers

Bathroom remodeling questions

How long does a bathroom remodel take?
A hall or guest bath typically runs 3 to 5 weeks on site. A primary suite with a custom shower, a freestanding tub, and relocated fixtures runs longer. Tile is the pace-setter: waterproofing has to cure, and stone or large-format tile takes longer to set than anyone expects from looking at the room.
Do I need a permit to remodel a bathroom?
If the work moves plumbing or electrical, alters walls, or adds a fan where there was none, yes. Swapping a vanity, a toilet, and a mirror in place generally does not. We sort out which side of that line your project falls on at the consultation and file whatever is required.
Can you make a small bathroom feel bigger without moving walls?
Usually. Replacing a swinging shower door with a fixed glass panel, moving to a wall-hung or floating vanity, running the same tile up the wall, and getting the lighting off a single ceiling fixture change the perception of a room far more than a few inches of actual floor area would.
Should I convert my tub to a walk-in shower?
It depends on what else is in the house. If it is your only full bathroom, keeping one tub is worth it for resale and for anyone with small children. If you have another tub elsewhere, converting a cramped tub-shower into a proper walk-in is one of the highest-satisfaction changes we make, particularly for owners planning to stay in the house long term.
What is the most common thing you find behind a bathroom wall?
Water damage around the shower pan and the toilet flange, and old galvanized supply lines. Bathrooms in houses of this age were built before modern waterproofing membranes existed, so a shower that looks fine has often been leaking slowly into the framing for years. We open it up, show you what is there, and price the repair before tile goes on.
Can I use another bathroom while you work?
That is the plan whenever the house has one. We dust-wall the work zone, protect the path from the entry to the bathroom, and keep the rest of the house usable. If it is a single-bathroom home, we tell you honestly at the consultation how many days you will be without it and schedule to keep that window as short as possible.
Do you install curbless and accessible showers?
Yes. A curbless entry needs the floor framing recessed or the whole floor built up, so it is a decision that has to be made before demolition rather than after. We also handle blocking for future grab bars, comfort-height fixtures, and wider door openings for anyone planning to stay in the house long term.
What warranty comes with the work?
Our workmanship is warrantied, and manufacturer warranties on fixtures, tile, and glass pass directly to you. The terms are written into your contract before you sign anything.
Where we work

Proudly serving these areas

We remodel bathrooms throughout Encino and the surrounding San Fernando Valley and Westside communities. Tap your city for local housing stock and permitting.

Not on the list? Call (818) 881-8333 — we travel outside our core area for the right project.

Our other services

Ready to rebuild your bathroom?

We will walk the room, check the venting and the plumbing runs, talk through what is realistic in the footprint, and give you a fixed written price. No charge, no obligation.